The project will be completed in multiple phases to minimize disruption to campus transit systems. Please observe all posted signage and directions from traffic control personnel.
Bus Drop Off: South curb of Circle Drive, across from the high school.
Exit Route: Buses exit via the Uber/Lyft passenger zone (temporarily modified for bus clearance).
Note: No stopping or idling allowed at the turn-about.
Layover Area: North curb of Circle Drive, in front of the high school.
Work Area: Pavement replacement on Campus Road.
Traffic Impact: Campus Road closed to all vehicular traffic.
Bus Drop-Off: Northwest corner of State University Drive and Campus Road.
Pedestrian Access: Sidewalks remain open for safe foot access to and from campus.
During Phases 3 & 4, Campus Road and the Transit Center fully restored and operational buses will have access to the CSULA Transit Center.
- Phase 3 (February 21 – April 5) the south lane of Circle Drive will be closed. All transit vehicles will use the north lanes to access the transit center.
- Phase 4 (April 6 – May 15) the north lane of Circle Drive will be closed. All transit vehicles will use the south lanes to access the transit center.
Route Instructions
- Inbound Bus Operations: Buses will proceed eastbound via Circle Drive, then merge left to continue east on the westbound lane to access the alternate transit center terminal.
- Outbound Bus Operations: Buses will turn right onto Circle Drive and resume their regular route along Campus Road.
Completion: Once this phase ends, there will be no restrictions on bus movements.