All Projects by Facility

Administration and Student Affairs Building Abatement and Demolition

Plans and specifications for the abatement and demolition of the Administration and Student Affairs Buildings are being designed.  The overall scope will be to demolish the buildings including their foundations. 

The Anna Bing Child Care Center is undergoing a roof, sewer line, fire alarm, and fire sprinkler replacement.

Fume Hood Replacement Project

The scope of work will entail the installation of five (5) new laboratory fume hoods and base cabinet units, and connection to previously installed fluoropolymer coated stainless steel HVAC ducts, air valves, and BACnet compatible airflow controllers that were installed under a recent, HEERF II funded improvements project.

No current projects as of April 2022.

No current projects as of April 2022.

No current projects as of April 2022.

No current projects as of April 2022.

Hazardous Storage Facility Replacement

The 90-day hazardous waste storage facility will be replaced with a new facility up to the current State Fire Marshal code. 

No current projects as of April 2022.

No current projects as of April 2022.

No current projects as of April 2022.

No current projects as of April 2022.

Merv-13 Outside Air

  • Water Infrastructure Utilities Repair Project
  • Voice over Internet Protocol
  • Campus-wide Metering

No current projects as of April 2022.

No current projects as of April 2022.

No current projects as of April 2022.

Center for Academic Success and Center for Faculty Excellence

No current projects as of April 2022.

Scoreboard Replacement

No current projects as of January 2022.

No current projects as of January 2022.

No current projects as of January 2022.

No current projects as of January 2022.

Two Scoreboard Replacements

No current projects as of January 2022.

No current projects as of January 2022.

No current projects as of January 2022.

No current projects as of January 2022.

  • Three Dormitory Towers
  • Elevator and Bridge
  • Recreation Fields
  • Fire Access Road

Seismic Retrofit and Tenant Improvement: Initially completed in 1970, the 8 story Student Services Building, previously named the Physical Sciences building, underwent a seismic retrofit and major building upgrade including the windows, roofing, plumbing, mechanical, electrical, fire suppression, building controls, and security. The layout of each floor has been developed with new configuration, finishes, fixtures and equipment to support campus administration and student services, which will be housed in the newly renovated building. It is 218,000 sq. ft. and is located on the Main Campus. Completion date Fall 2021.

Pedestrian Safety Improvements

No current projects as of January 2022.