Projects in Construction

JFK Library South - System Upgrade

Start Date:  
Estimated Completion Date: May 2009
Executive Architech:  N/A
Architech: R2A Architecture
Contractor: Waisman Construction
Project Budget:  $1.19 Million
Building Area - Gross S.F.:  N/A
Building Area - Assigned S.F.: N/A
Major Spaces: Circulation desk, ITS Help Desk, Computer Centers.
Scope of Work: Project shall address and prioritize replacement and upgrades to components of the lighting and elevator systems. Project will also address existing deficiencies in the HVAC, telecommunications, security and electrical systems. The main library entry shall be expanded and rearranged to better accommodate both new electronic information technologies and better workflow between the entry/exit control point and the main circulation desk. These improvements will support the full range of support services that student’s need for academic success in a learning based environment.

Library South

Wallis Annenberg Integrated Science Complex - Wing B

Start Date:  
Estimated Completion Date: April 2010
Executive Architech: AC Martin
Architech: IBI Group
Contractor: Bernards
Project Budget: $45 Million
Building Area - Gross S.F.: 94,000
Building Area - Assigned S.F.:  TBD
Major Spaces: Planetarium
Scope of Work: The proposed Science Building Wing B completes the Replacement Science Building, consisting of Wing A (recently completed in Aug 2008) and the proposed Wing B. The proposed Wing B will be three stories and a total of 94,000 square feet. Wing B will be devoted primarily to wet laboratories and fume hood intensive space to meet the needs of the Natural and Allied Health Departments. The Science Replacement Building would contribute to the creation of a consolidated science zone on campus, which will unify the science programs, decrease pedestrian distances between science classes, and foster a more cohesive environment that promotes science curriculum to potential enrollees. The University proposes a planetarium on the third floor of Wing B.

Wallis Annenberg Integrated Science Complex - Wing B

Simpson Annex Lecture Hall Ramp

Start Date:  
Estimated Completion Date: March 2009
Executive Architech: N/A
Architech: 
Clerkin & Clerkin
Contractor: KBD Construction
Project Budget: 
Building Area - Gross S.F.: N/A
Building Area - Assigned S.F.:  N/A
Major Spaces: Lecture hall
Scope of Work: This project will upgrade the ramp leading to the Simpson Annex lecture hall to meet current ADA standards.

No Picture Available

Anna Bing Child Care Center Play Yard Renovation

Start Date: 
Estimated Completion Date: June 12, 2009
Executive Architech: N/A
Architech: N/A
Contractor: Terra Form
Project Budget: $108,000
Building Area - Gross S.F.: N/A
Building Area - Assigned S.F.:  N/A
Major Spaces: Child Play Yard
Scope of Work: Renovation includes construction of alterations to the existing Kindergarten Play Yard at the Anna Bing Arnold Child Care Facility. This includes demolitions and removal of existing landscaping and irrigation, sidewalks and play yard surface materials. Construction of new concrete and wood walkway surfaces, landscape and irrigation, and installation of play yard finish surfacing materials, accessories and sitework.

Anna Bing Arnold Play Yard

Campus Wide Fire Alarm System Upgrade - Phase I

Start Date: 
Estimated Completion Date: February 2010
Executive Architech: N/A
Architech: Hughes Associates
Contractor: Cosco Fire Protection
Project Budget: $1.5 Million
Building Area - Gross S.F.: N/A
Building Area - Assigned S.F.:  N/A
Major Spaces: Various buildings
Scope of Work: Project will renovate and replace existing deteriorated fire alarm and fire sprinkler components and system campus wide. The project will replace fire alarm system hardware and components to make it code compliant and fully compatible with the master campus fire alarm system. The project will include upgrades to the Fire Alarm System for the Simpson Tower, Parking Structure B, Salazar Hall, Simpson Annex, Physical Education, Fine Arts, Library North and South buildings and the new Campus front end unit at the Campus Police Building.

No Picture Available

Corporation Yard

Start Date: 
Estimated Completion Date: On Hold
Executive Architech: N/A
Architech: Carter Burgess
Contractor: USS Cal Builders
Project Budget: CY $14 Million
Building Area - Gross S.F.: CY 55,000
Building Area - Assigned S.F.:  N/A
Major Spaces: Planning and Construction, Facilities Services
Scope of Work: The Corporation Yard will be built on its current site. A two story structure will house Facilities Services and Planning and Construction. A screened wall and landscaping will enhance the pedestrian path from the MTA Station to the campus. The proposed Public Safety Building consists of a new one story building. The site is approximately 160 feet wide by 200 feet long. The building will be bordered by the Campus Drive and Paseo Rancho Castilla intersection.

Corporation Yard

Public Safety Building

Start Date: 
Estimated Completion Date: November 2009
Executive Architech: N/A
Architech: N/A
Contractor: N/A
Project Budget: $6 Million
Building Area - Gross S.F.: 16,000
Building Area - Assigned S.F.:  N/A
Major Spaces: Parking Services, Public Safety Offices
Scope of Work: 

Public Safety Building

ADA Upgrade from Greenlee Plaza to Bio Science

Start Date: 
Estimated Completion Date: July 2009
Executive Architech: N/A
Architech: Clerkin & Clerkin
Contractor: MTM Construction
Project Budget: 
Building Area - Gross S.F.: N/A
Building Area - Assigned S.F.:  N/A
Major Spaces: Pedestrian ramp
Scope of Work: This project will upgrade the ramp leading from the Physical Science building to the Bio Science building to meet current ADA standards.

No Picture Available

ADA Access to the Planter and Fountain Areas at Greenlee Plaza

Start Date: 
Estimated Completion Date: March 2009
Executive Architech: N/A
Architech: Clerkin & Clerkin
Contractor: Hilbrick Construction
Project Budget: $200,000
Building Area - Gross S.F.: N/A
Building Area - Assigned S.F.:  N/A
Major Spaces: Planter and Fountain areas
Scope of Work: This project will upgrade the current Greenlee Plaza planter and fountain areas with ramps that meet current ADA standards.

No Picture Available