Project Title
|
The Damutu Tidal Flat to Be Enclosed for
Land and Developed for Breeding in a Multiple Way at the Second
Phase
|
Cooperation
Form
|
Joint Venture or Cooperation
|
|
|
ProjectScheme,
Construction
Planning,
Marketing Analysis,
Business Scaleand
Estimated Sales
|
The
scale of construction: enclosing 15,600 mu(1,040 hectares) of
tidal flat for breeding aquatics and other complex development.
The Damutu tideland at the second phase would be enclosed
from Beigu Hill to Longdong Hill via Dayang Isle. The sea embankment
will be 3208 metres long. The tideland to be enclosed will total
15,600 mu, including 3,000 mu for construction, 7,800 mu for
plantation, 3,000 mu for breeding, and 1,800 mu for flood detention.
The project is aimed at the extension of land by enclosing the
tideland. This would provide land for the county's construction,
and raise the battle against flood. Meanwhile, in deep water
are bred the greater croaker, perch, prawn, swimming crab and
others. After the project is completed, the compensation fee
for the transfer of 3,000 mu land can be obtained, and the fee
to the use of enclosed land on an area of 7,800 mu will be paid,
thus resulting in a considerable economic results. The project
is composed of two parts,i.e., the tidal flat to be enclosed
and its necessary facilities. The duration of construction would
be three years.
The annual sales income is expected to be 150 million
yuan with the annual profit of 22.5 million yuan. |
Equipment Tobe Importedand Rawmaterials to Be Supplied
|
- |
Estimated Investment and Benefit Analysis
|
Total
Investment
|
USD
16 million
|
Registered
Capital
|
USD
6.4 million
|
Annual
Salesincome
|
RMB
150 million
|
|
Investment Form of Foreign Partner
|
Annual
profit
|
RMB
22.5 million
|
|
Cash
|
Technology
|
Equipment
|
Brand
|
Others
|
Internal
Rateof
Recovery
|
15 percent
|
|
¡Ì
|
-
|
-
|
-
|
-
|
Recovery
Periodof
Investment
|
6 years
|
Present Status of Chinese Partner(Current Ownership, Total
Assets and Fixedassets, Present Products and Sales, Present
Equipment Andtechnology and Facilities, etc.)
|
Xiangshan
Damutu Tidal Flat Enclosure & Development Company, Ltd.,
an economic entity with legal person, can perform the independent
economic reckoning internally and be responsible for the economic
duty externally. It takes full charge of project construction,
production and operation. |
|
Location Advantage
|
The
location advantage is available for project construction. |
|
Process of The Project
|
Feasibility
study completed |
Document
Savailable
|
Feasibility
study |
|
Chinese Partner to Contact
|
Xiangshan
Foreign Investment Service Centre |
Person to
Contact
|
Sun Xiaofen |
|
Address
|
11th
floor, Luye Mansion, Dancheng Town, Xiangshan County, Zhejiang,
China |
Post Code
|
315700 |
|
Telephone
|
0086
- 574 - 65722141 |
Fax
|
0086
- 574 - 65751673 |
|
E-mail
|
- |
Website
|
- |
Municipal Liaison Department: Ningbo Municipal Commission
of Foreign Trade and Economic Cooperation
(Ningbo foreign Investment Development Board)
Address: 190 Lingqiao Road, Ningbo 315000, P.R.China
Telephone: 86-574-87327023(Information Liaison Dept.), 87315735(The
First Sector Dept.), 87310671(The Second Sector Dept.)
Fax:86-574-87315992, 87327429
E-mail: xmb@ningbochina.com
Website: www.ningbochina.com
|