THE PROPOSED PROJECTS FOR INTERNATIONAL ECONOMIC
AND TECHNICAL COOPERATION IN NINGBO IN 2001

Ser. No: 056 Industry: Service Industry
March, 2001
Project Title
Central Hospital in Ningbo High-tech Industry Park
Cooperation
Form
Joint Venture, Cooperation or Others

Project
Description

ProjectScheme,
Construction
Planning,
Marketing Analysis,
Business Scaleand
Estimated Sales
The scale of construction: The hospital is planned to accommodate 400 beds, including 240 beds at the first phase on an area of 74,000 sq.m. with the construction of 23,450 sq.m..
The hospital will start a high-tech outpatient service and make a most advanced clinical research to increase the diagnostic rate and the cure rate, and ensure the basic medical treatment for the park. Furthermore, the special medical institution for the difficult and complicated cases of illness will be set up. The project is to be divided into two phases of construction. The duration of the cinstruction at the first phase will be 1.5 years, and at the second phase, the expansion of the hospital will be decided according to the specific conditions.
It is predicted that the annual business income would be 50 million yuan with the annual profit of 15 million yuan.

Equipment Tobe Importedand Rawmaterials to Be Supplied

Intended to import the medical apparatus and instruments.

Estimated Investment and Benefit Analysis

Total
Investment
USD10 million
Registered
Capital
USD
5 million
Annual
Salesincome
RMB 50 million
Investment Form of Foreign Partner
Annual
profit
RMB 15 million
Cash
Technology
Equipment
Brand
Others
Internal
Rateof
Recovery
17 percent
¡Ì
¡Ì
¡Ì
-
-
Recovery
Periodof
Investment
5.6 years

Present Status of Chinese Partner(Current Ownership, Total Assets and Fixedassets, Present Products and Sales, Present Equipment Andtechnology and Facilities, etc.)

Ningbo High-tech Industry Park was set up in May, 1999. In order to build the high-standard infrastructure necessary for the high-tech industry, the park will try to push the project forward.
Location Advantage
The site for the project depends on the city proper, 15Km from Beilun Port, 6Km from Hangzhou-Ningbo expressway, 18Km from Lishi airport, and 7Km from Ningbo train station. It can enjoy the preferential policy on the high-tech industrial sector. Water, power and gas are available there.
Process of The Project
Foreign investment is welcome
Document
Savailable
The description of the project
Chinese Partner to Contact
The Economic Development Bureau of Ningbo High-tech Industry Park
Person to
Contact
Wang Weidong
Address
599, Jiangnan Road, Ningbo, China
Post Code
315040
Telephone
0086 - 574 - 87906140
Fax
0086 - 574 - 87906804
E-mail
edbip@mail.nbptt.zj.cn
Website
-

Municipal Liaison Department: Ningbo Municipal Commission of Foreign Trade and Economic Cooperation
(Ningbo foreign Investment Development Board)
Address: 190 Lingqiao Road, Ningbo 315000, P.R.China
Telephone: 86-574-87327023(Information Liaison Dept.), 87315735(The First Sector Dept.), 87310671(The Second Sector Dept.)
Fax:86-574-87315992, 87327429
E-mail: xmb@ningbochina.com
Website: www.ningbochina.com